We’re working to improve transportation along the Alameda de las Pulgas corridor, commonly referred to as ADLP, between Ralston Avenue and Cranfield Avenue.
Thank you, Belmont – and our neighbors in San Carlos – for joining us in 2022 for our summer and fall Community Workshops (pictured above).
Turnout was great and your input and ideas helped us as we worked with the BKF Engineering design team to complete the preliminary 65 percent project design by this fall. The project design will include construction level details for roadway layout, intersection improvements, traffic signal, drainage, utilities, stormwater treatment, grading design, and striping plans.
After 65 percent design review and comments, we will move toward 100 percent design and preparing construction and bid documents by 2024.
Phase 1 of construction is scheduled to begin in 2025 or 2026, depending on the success of future grant applications.