NNOWe understand your time is precious, so we are planning to provide you with up to date information so you have greater control over your drive, with insights that allow you to discover the best route so you can save time.  

We are bringing you the traffic advisory weekly updates on currently known roadway and related projects, and private utility work (based on street encroachment permits), to provide you an opportunity to look ahead, plan your travel times and check delays due to various street activities.   

 

                           

 

 

 

 

Shoreway Sewer Replacement Project

January 4-January 11

8:00AM -5:00PM

The contractor will be continuing to excavate and install the new 18” PVC sewer main along Shoreway Road. The contractor is currently working at a unique location on the project where extended work hours are warranted, thus allowing the contractor to perform Saturday work would help mitigate this impact on the project. Temporary traffic signals have been installed for after hours traffic control, but during the normal working hours flaggers and pedestrian control will be in place to help alleviate traffic congestion and assure pedestrian safety. Thank you for your patience and understanding during this challenging project.

 

 

 

 

 

Emergency Storm Line Replacement-Pullman Ave

Monday January 14 - Friday January 18

8:00 AM- 4:00 PM 

Monday morning, Pullman Avenue will be closed at the West side of the intersection at Coronet Boulevard and a portion Coronet Boulevard South bound toward Ralston Avenue will be closed at the intersection to Pullman Avenue. 

There will be a detour in effect while the road is closed that will divert traffic around Pullman Avenue to Ewell Road and back to Coronet Boulevard. I will keep everyone updated with this project.

 

 

 

 

Tahoe Dr at Ralston Ave Signalization

January 21 - January 25

9:00AM -3:00PM

Columbia Electric will be installing traffic signals on Ralston Avenue in the week of January 21, 2019. Lane closures are expected along Ralston Avenue between 9am-3pm. Traffic at the Tahoe Drive intersection will also be affected. Traffic control will be in place.

 

 

 

 

 Cipriani Blvd (between Newlands and Semeria)

Monday January 14th - Friday January 25

8:00 AM - 5:00 PM (Monday through Friday)

Mastec/JPI Construction will be installing fiber optic conduit for Verizon Wireless on Cipriani Blvd. The scope of work is directional boring 936’ of 1-2” HDPE conduit and 45’ of open trenching, which includes (2) 3’x5’x3’ excavations. The contractor with have traffic control with one lane closed and flaggers. This work is scheduled between Monday, January 14 thru Friday, January 25th. Working hours are from 8am-5pm Monday thru Friday each week.